Re-opening Of The Tipilikwani Mara Camp Bridge After Maintenance
Dear Partners,
It gives us great pleasure to announce that our bridge that connects Tipilikwani Mara Camp directly to the park will be re-open for use as of Friday, 15th April 2022.
Among the works on the bridge was to raise it by a further one and half metres so as to protect it from damage that could come about due to possible future flooding of the Talek river.
Effective this date, guests arriving at the camp, will be able to use the bridge when checking in or proceeding on game drives.
We apologize for any inconvenience caused during the period that the bridge was undergoing repairs.
Thank you for your patience.